Work on the roof structures

Side elements for the roof construction. https://vrkbespoke.com/wp-content/uploads/2022/06/Seiten-Elemente-für-die-Dach-Konstruktion-01.mp4https://vrkbespoke.com/wp-content/uploads/2022/06/Seiten-Elemente-für-die-Dach-Konstruktion-02.mp4https://vrkbespoke.com/wp-content/uploads/2022/06/Seiten-Elemente-für-die-Dach-Konstruktion-03.mp4

Work on the hulls

Work on the fuselages and the inner reinforcements. The cut-outs and sub-constructions for the cabin windows in the fuselages are being made. https://vrkbespoke.com/wp-content/uploads/2022/06/WAVE-60-VRK-bespoke-Under-Construction-in-the-Yard-in-Stettin-2022-06-08.mp4

Cross-bracing and partition walls

The cross braces, fuselage reinforcements and partition walls of the cabins are installed and the side elements of the curved roof superstructure are made. The cut-outs for the cabin windows in the fuselages are made.

Underwater hull with connected hulls

The underwater hull and the hulls connected to the central construction of the main deck in the shipyard hall in Szczecin/Poland: longitudinal reinforcements and laminating work inside the hulls. https://vrkbespoke.com/wp-content/uploads/2022/03/WAVE-60-VRK-bespoke-Construction-of-the-Hulls-2022-03-11.mp4

In the shipyard hall in Szczecin

Work on the two individual hulls in the shipyard hall in Szczecin/Poland. https://vrkbespoke.com/wp-content/uploads/2022/07/WAVE-60-VRK-bespoke-Hulls-in-the-Shipyard-in-Stettin-2022-01-25.mp4

Negative forms

The two individual hulls detached from the negative moulds in the shipyard hall in Szczecin/Poland.